India's installed solar capacity has doubled since 2022 but its contribution to actual electricity generation remains low due to lack of storage. The inability to store solar power leads to wasteful curtailment (2.3 TWh in 2025) and grid instability, highlighting the urgent need to pair solar auctions with battery storage to achieve energy transition goals.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›India's Peak Power Demand: 256.1 GW (April 25, 2026)
- ›Solar's Peak Afternoon Contribution: 21.5% (April 25, 2026)
- ›Target this Data: 2.3 TWh of solar energy curtailed in 2025.
- ›Target this Data: Solar contributed 21.5% of afternoon load but only 10.8% of daily generation on April 25, 2026.
- ›Target this Nodal Body: India Meteorological Department (IMD) for monsoon forecasts.
- ›Target this Metric: Solar's installed capacity share (~28% in 2026) vs. generation share (~10.8%).
Mastered this topic? Test your knowledge with a full MCQ quiz.
Practice exam-style questions, track your score, and strengthen your recall.