India's renewable energy push faces a critical bottleneck: over 4,000 MW of commissioned solar power in Rajasthan is being curtailed due to a transmission gap, eroding investor confidence. This highlights the urgent need for synchronized planning between generation and grid infrastructure to achieve usable reliability for India's clean energy transition.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›Curtailed Solar Capacity: Over 4,000 MW
- ›Rajasthan Renewable Capacity: 23 GW
- ›Target this Data: Over 4,000 MW of renewable power curtailed in Rajasthan.
- ›Target this Nodal Body: Joint committee of NLDC, SLDCs, PGCIL, CTUIL, and Siemens (July 2025).
- ›Target this Legal Point: Grid stability is a binding duty under the Electricity Act and Grid Code.