The Cabinet Committee on Economic Affairs (CCEA) has approved India's first underwater twin-tube road-cum-rail tunnel under the Brahmaputra River in Assam at a cost of Rs 18,662 crore. This 34-km mega-project will slash travel time between Gohpur and Numaligarh from 6 hours to 20 minutes, dramatically improving multimodal connectivity for Assam, Arunachal Pradesh, and Nagaland. It's a strategic infrastructure leap for the Northeast, aimed at boosting trade, tourism, and economic integration.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›Project Cost: Rs 18,662 crore
- ›Total Length: 33.7 km
- ›Target this Data: Rs 18,662 crore (Total Capital Cost), 33.7 km (Total Project Length), 15.79 km (Underwater Tunnel Length), 80 Lakhs (Person-days of Employment).
- ›Target this Nodal Body: Cabinet Committee on Economic Affairs (CCEA) - approving body; Ministry of Railways - implementing agency.
- ›Target this Geographical Point: Brahmaputra River (the river under which the tunnel passes); Connects Gohpur (NH-15) to Numaligarh (NH-715) in Assam.
Mastered this topic? Test your knowledge with a full MCQ quiz.
Practice exam-style questions, track your score, and strengthen your recall.