Ken-Betwa Link Project: ₹44,605 Cr First Inter-Basin River Link Faces Rehabilitation Hurdles

Target:MPSCUPSCTeachingSSC GAPrelims HighMains HighStatic GK Link
21 Jul 2026
~2 min
Source: Indian Express
Key Data:₹44,605 crore9.04 lakh hectares103 MW27 MW194 million cubic metres2,853 million cubic metres
Bodies:National Water Development Agency (NWDA)Ministry of Environment, Forest and Climate Change (MoEFCC)Madhya Pradesh GovernmentUttar Pradesh GovernmentChhatarpur Collector
Practice MCQs from today's news ▸
What This Article Covers

1.India's first inter-basin river link project, Ken-Betwa, at ₹44,605 crore, aims to transfer water from Ken to Betwa basin.

2.Project will irrigate 9.04 lakh hectares in Bundelkhand's drought-prone districts, generate 103 MW hydropower, and supply 194 million cubic metres drinking water annually.

3.Over 1,900 families across 10 villages face displacement; protests over compensation and survey irregularities highlight rehabilitation challenges.

The Big Picture
Prelims · HighMains · High

Ken-Betwa Link Project, India's first inter-basin river link, costing ₹44,605 crore, has entered a decisive phase. The project aims to irrigate 9.04 lakh hectares and generate 103 MW hydropower, but faces protests over rehabilitation of 1,913 families. Essential for understanding water management, displacement, and infrastructure challenges in exam context.

Exam Lens

Quick Exam Facts From News

Project Cost₹44,605 crore
Irrigation Potential9.04 lakh hectares
Hydropower Generation103 MW
Solar Energy27 MW
Drinking Water Supply194 million cubic metres/year
Daudhan Dam Capacity2,853 million cubic metres
Link Canal Length218.6 km
Affected Families1,913
Tribal Population33.9%

1-Minute Revision

  • ›Project Cost: ₹44,605 crore
  • ›Irrigation Potential: 9.04 lakh hectares
  • ›Target this Data: ₹44,605 crore cost, 1,913 families, 9.04 lakh hectares irrigation, 2,853 MCM dam capacity
  • ›Target this Nodal Body: National Water Development Agency (NWDA) under Ministry of Jal Shakti
  • ›Target this Legal Point: Environmental Clearance stipulation by MoEFCC that rehabilitation must be completed before commissioning

Mastered this topic? Test your knowledge with a full MCQ quiz.

Practice exam-style questions, track your score, and strengthen your recall.

Q1Static LinkageEasy

Which ministry issued the Environmental Clearance stipulation for the Ken-Betwa Link Project?

Q2Statement-basedHard

Consider the following statements:

1. The Ken-Betwa Link Project is India's first inter-basin river link.

2. The Daudhan dam reservoir has a gross storage capacity of 2,953 million cubic metres.

3. The project will irrigate 9.04 lakh hectares of land.

Which of the statements given above is/are correct?

Q3Data-centricMedium

According to the article, what is the estimated number of affected families identified in the project's resettlement and rehabilitation plan?

Q4Application/ImpactMedium

What is the primary objective of the Ken-Betwa Link Project?

All 25 MCQs ▸
You finished this topic
Explore Related Topics
Related Current Affairs
Environment Current Affairs

Ken-Betwa River Link: Adivasis Resist Daudhan Dam Displacement, Offered ₹12.5 Lakh Compensation

The Ken-Betwa river linking project in Madhya Pradesh is displacing tribal communities in Bundelkhand. Affected villagers are protesting despite compensation of ₹12.5 lakh per eligible adult and ₹5 lakh per acre, because they fear losing their cultural identity, language, and community. This highlights the conflict between development and indigenous rights.

Infrastructure Current Affairs

MP Revives Bus Network After 21 Years: 351 Buses Under PM e-Bus Sewa, Gadkari Warns on Safety

Madhya Pradesh has revived its public bus network after 21 years, launching 351 buses under PM e-Bus Sewa and Mukhyamantri Sugam Parivahan Sewa. Union Minister Nitin Gadkari issued warnings on bus safety and corruption, while pushing for a shift to electric buses. This marks a major shift from the defunct MPSRTC to a PPP model with strict safety checks.

Infrastructure Current Affairs

Tamil Nadu CM Seeks National Project Status for Godavari-Cauvery-Gundar River Link: SPV Proposed

Tamil Nadu CM pushes for the Godavari-Cauvery-Gundar river linking project, a key inter-state water transfer initiative, seeking 'National Project' status and a Special Purpose Vehicle (SPV) for fast-track execution. This is crucial for augmenting TN's surface water resources and addressing drinking/irrigation needs, especially in southern districts.

Environment Current Affairs

Godavari-Cauvery-Gundar Link: TN CM Demands Full Execution to Save 5 Drought-Prone Districts

Tamil Nadu CM Joseph Vijay has appealed to PM Modi for full execution of the Godavari-Cauvery-Gundar river linking project, as the current NWDA plan to link Godavari-Pennar-Palar-Vellar would only benefit northern districts. The project, if implemented as per earlier plan, could provide permanent irrigation and drinking water to five southern districts facing drought, utilizing 1,100 TMC of Godavari water.

Environment Current Affairs

EAC Recommends Green Nod for 1,605 MW Subansiri Upper Project; 1.35 Lakh Trees at Risk

The EAC's recommendation for environmental clearance to the 1,605 MW Subansiri Upper Hydro Project highlights the tension between hydropower development and forest conservation. Key issues include diversion of 2,733 hectares of forest land, felling of 1.35 lakh trees, and compensatory afforestation in MP. This is crucial for UPSC Mains GS3 (Environment, Infrastructure) and Prelims (Forest Conservation Act, EAC).

Environment Current Affairs

X-Band Doppler Weather Radar to be Commissioned in Wayanad by Dec 2026 After 298 Deaths in 2024 Landslides

Wayanad district in Kerala, hit by deadly landslides in 2024 and 2026, will get an X-band Doppler weather radar by December 2026 to improve extreme weather forecasting. The radar, to be installed at Pulpally, will cover 100 km radius and help disaster management authorities.

Environment Current Affairs

Odisha Mandates Suspension of Hydropower Generation to Prioritise Drinking Water and Irrigation Needs

Odisha has mandated that hydropower generation be suspended if reservoir water levels fall below critical thresholds, prioritizing drinking water and irrigation. This decision, amid low storage and El Niño concerns, highlights the water-energy nexus and has implications for energy security and agricultural resilience. For exams, this links to water resource management, energy policy, and disaster preparedness.

Polity Current Affairs

Ken-Betwa Link: Centre Defers Displacement Grievances to MP Govt; 7,000 Families at Risk Under FRA

The Ken-Betwa River Link Project, a flagship interlinking river project, faces protests over displacement of over 7,000 families. The Centre has shifted responsibility to the Madhya Pradesh government for implementing the Forest Rights Act and compensation, raising questions about federal accountability and tribal rights. This is crucial for UPSC Polity (Centre-State relations), Environment (river linking), and Social Justice (tribal rights).