Kerala is commissioning India's first 4-hour grid-scale Battery Energy Storage System (BESS) at Mylatti (125 MW/500 MWh) by October 2026 to stabilize its power grid and integrate renewable energy. This project is critical for understanding India's energy transition, grid management, and the Build-Own-Operate (BOO) model used in public infrastructure.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›Mylatti BESS Capacity: 125 MW / 500 MWh
- ›Daily Storage Capacity (Mylatti): 5 lakh units
- ›Target this Data: Mylatti BESS capacity: 125 MW / 500 MWh (first 4-hour BESS in India)
- ›Target this Nodal Body: SECI (Solar Energy Corporation of India) for Mylatti; NHPC for Mulleria
- ›Target this Model: Build-Own-Operate (BOO) model