Science & TechnologyEnergy
News 6 of 29

Prototype Fast Breeder Reactor Attains Criticality at Kalpakkam, Key to India's Three-Stage Nuclear Programme

Target:UPSC GS-IIIMPSCSSC GATeachingPrelims HighMains HighStatic GK Link
13 Apr 2026
~2 min
Source: Indian Express
Bodies:Department of Atomic Energy
Practice MCQs from today's news ▸
What This Article Covers

1.Prototype Fast Breeder Reactor (PFBR) in Kalpakkam, Tamil Nadu, attains criticality, a key milestone in India's three-stage nuclear programme.

2.The fast breeder reactor (Stage 2) is more complex than Pressurised Heavy Water Reactors (Stage 1) and paves the way for thorium utilization (Stage 3).

3.This development is strategically vital for India's energy security, reducing import dependence and aligning with clean energy goals.

The Big Picture
Prelims · HighMains · High

India's Prototype Fast Breeder Reactor (PFBR) at Kalpakkam has achieved criticality, marking a crucial step in the second stage of India's three-stage nuclear programme envisioned by Homi Bhabha. This technological milestone is critical for energy independence and transitioning to thorium-based fuel in the future.

Exam Lens

Quick Exam Facts From News

Reactor NamePrototype Fast Breeder Reactor (PFBR)
LocationKalpakkam, Tamil Nadu
Stage of ProgrammeSecond Stage
Key VisionaryHomi Bhabha

1-Minute Revision

  • ›Reactor Name: Prototype Fast Breeder Reactor (PFBR)
  • ›Location: Kalpakkam, Tamil Nadu
  • ›Target this Data: Prototype Fast Breeder Reactor (PFBR) at Kalpakkam, Tamil Nadu
  • ›Target this Nodal Body: Department of Atomic Energy (DAE), Bhabha Atomic Research Centre (BARC)
  • ›Target this Legal Point: SHANTI Act (for nuclear liability and regulation)

Mastered this topic? Test your knowledge with a full MCQ quiz.

Practice exam-style questions, track your score, and strengthen your recall.

Q1Static LinkageEasy

The Prototype Fast Breeder Reactor (PFBR) mentioned in the news is located in which state?

Q2Statement-basedHard

Consider the following statements regarding India's three-stage nuclear programme:

1. The first stage is based on Pressurised Heavy Water Reactors using natural uranium.

2. The Prototype Fast Breeder Reactor (PFBR) attaining criticality marks the completion of the third stage.

3. The ultimate goal of the third stage is to utilize India's abundant thorium reserves.

Which of the statements given above is/are correct?

Q3Data-centricMedium

According to the article, who is credited with articulating the vision of India's three-stage nuclear pathway?

Q4Application/ImpactMedium

What is a primary strategic significance of India's fast breeder reactor programme, as highlighted in the news?

All 25 MCQs ▸
You finished this topic
Explore Related Topics
Related Current Affairs
Economy Current Affairs

Kudankulam Nuclear Reactor Costs Surge 55%: Impact on India's Nuclear Expansion Plans

Cost of four under-construction nuclear reactors at Kudankulam has risen by 55% to ₹1,38,330 crore, driven by Russia-Ukraine war. This poses a challenge to India's ambitious nuclear expansion plans and could increase electricity tariffs, especially as the government opens the sector to private participation.

Environment Current Affairs

Climate Change Intensifies Clear Air Turbulence: 55% Rise in Severe CAT Over North Atlantic, DGCA Investigates Air India Incident

Climate change is making mid-flight turbulence, especially clear air turbulence (CAT), more frequent and severe. A 2023 study found severe CAT over the North Atlantic rose over 55% in four decades. For exam aspirants, this links climate change impacts to aviation safety, DGCA's regulatory role, and passenger safety protocols.

Science & Tech Current Affairs

India’s First LNG-Diesel Dual-Fuel Train Launched by ICF; Compare with Hydrogen Train for UPSC

Indian Railways launched its first LNG-diesel dual-fuel train from Sabarmati on September 27, 2026, following the hydrogen train debut in July. This is a high-yield topic for UPSC Prelims (Science & Tech, Environment) and Mains (GS-3: infrastructure, alternative fuels). The article also explains Kavach (Automatic Train Protection system) – a recurring Prelims favourite.

Science & Tech Current Affairs

NPCIL Commences Fuel Loading at RAPP-8: 4th Indigenous 700 MWe PHWR in Fleet Mode

NPCIL has started initial fuel loading (IFL) at Unit 8 of Rajasthan Atomic Power Project (RAPP-8), a 700 MWe indigenous pressurised heavy water reactor (PHWR). This marks a major step in India's fleet-mode nuclear expansion, with commercial operation expected in 2026-27. For exams: understand PHWR technology, AERB's role, and the commissioning sequence (IFL → FAC → power generation).

Infrastructure Current Affairs

Amit Shah Flags Off India's First LNG-Powered Train: Dual-Fuel Tech to Cut Diesel Use by 40%

India's first LNG-powered train, flagged off by Amit Shah from Sabarmati, marks a major shift towards cleaner fuel in railways. The dual-fuel system can replace up to 40% of diesel, cutting emissions and saving Rs 23.9 lakh per year per rake. This is a key initiative for sustainable transportation and energy efficiency.

Science & Tech Current Affairs

Indian Railways Launches First LNG-Diesel Dual-Fuel DEMU Train; 40% Diesel Replacement, Rs 23.9 Lakh Annual Savings

Indian Railways has launched its first LNG-diesel dual-fuel DEMU train from Sabarmati, Gujarat, capable of replacing 40% diesel consumption. This follows the hydrogen train launched in July 2026, marking a strategic shift towards alternative fuels to reduce costs and emissions. For exam aspirants, this is a key case study in energy transition and infrastructure modernization.

Science & Tech Current Affairs

Doppler Weather Radars: 51st DWR Inaugurated at Sambalpur Under Mission Mausam

India's 51st Doppler Weather Radar was inaugurated in Sambalpur, Odisha, boosting weather forecasting under Mission Mausam. This expansion enhances early warning systems for cyclones, thunderstorms, and heavy rainfall, a core exam topic for disaster management and science-tech.

Environment Current Affairs

India Crosses 300 GW Non-Fossil Capacity, Targets 500 GW by 2030; Solar Leads at 164.59 GW

India has crossed 300 GW non-fossil fuel capacity (300.50 GW as of July 31, 2026), accounting for over 54% of total installed capacity. Solar power leads at 164.59 GW. The country is on track for 500 GW by 2030. Key schemes like PM Surya Ghar have benefited 19 lakh households with zero electricity bills. This milestone is crucial for exams on energy transition, climate policy, and government schemes.