The draft master plan for the ₹92,000 crore mega-infrastructure project on Great Nicobar Island has been notified, aiming to transform it into a strategic port and tourism hub. However, the plan faces significant opposition over ecological impact and tribal rights, with legal challenges pending in court, highlighting a classic development vs. conservation conflict for exam preparation.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›Project Cost: ₹92,000 crore
- ›Target Population by 2055: 3.36 lakh
- ›Target this Data: Project cost ₹92,000 crore; Target population 3.36 lakh by 2055.
- ›Target this Nodal Body: Andaman and Nicobar Islands Administration (notified the draft plan).
- ›Target this Legal Point: Forest Rights Act, 2006 (rights of Nicobarese and Shompen tribes).
Mastered this topic? Test your knowledge with a full MCQ quiz.
Practice exam-style questions, track your score, and strengthen your recall.