InfrastructureEconomy
News 0 of 31

Cabinet Approves Rs 25,446 Cr Elevated Highway Corridors in Varanasi, Railway Doubling/Quadrupling in Odisha & Jharkhand

Target:UPSCMPSCSSC GATeachingPrelims HighMains MediumStatic GK Link
15 Jul 2026
~2 min
Source: Indian Express
Key Data:Rs 25,446 crore43 km corridor46 km corridor910 m cable-stayed bridge1.32 km extradosed foot overbridge74 km doubling
Bodies:Union CabinetMinistry of Road Transport and HighwaysMinistry of RailwaysNHAI
Practice MCQs from today's news ▸
What This Article Covers

1.Two elevated highway corridors approved under Hybrid Annuity Mode (HAM): 43 km Varuna corridor (6/4-lane) and 46 km Ganga corridor (6-lane) with iconic 910 m cable-stayed bridge and 1.32 km extradosed foot overbridge with travelator to Kashi Vishwanath Temple.

2.Travel time in project influence areas to reduce from 60 minutes to about 20 minutes; design speed 80-100 kmph.

3.Railway projects: doubling of Paradeep-Haridaspur line (74 km) and quadrupling of Rajkharsawan-Dangoaposi line (71 km) to boost freight movement of coal, iron ore, dolomite, limestone, gypsum.

The Big Picture
Prelims · HighMains · Medium

Union Cabinet clears Rs 25,446 crore for two elevated highway corridors along Varuna (43 km) and Ganga (46 km) rivers in Varanasi to decongest the city and boost religious tourism. Also approves doubling of 74 km Paradeep-Haridaspur line in Odisha and quadrupling of 71 km Rajkharsawan-Dangoaposi line in Jharkhand to increase freight capacity by 44 mtpa.

Exam Lens

Quick Exam Facts From News

Total Project CostRs 25,446 crore
Varuna Corridor Length43 km
Ganga Corridor Length46 km
Cable-Stayed Bridge Length910 m
Foot Overbridge Length1.32 km (extradosed with travelator)
Travel Time ReductionFrom 60 min to 20 min
Design Speed80-100 kmph
Railway Doubling (Odisha)74 km Paradeep-Haridaspur
Railway Quadrupling (Jharkhand)71 km Rajkharsawan-Dangoaposi
Freight Capacity Increase44 million tonnes per annum (mtpa)
Annual Tourists in Varanasi~15 crore

1-Minute Revision

  • ›Total Project Cost: Rs 25,446 crore
  • ›Varuna Corridor Length: 43 km
  • ›Target this Data: Total cost Rs 25,446 crore; Varuna corridor 43 km, Ganga corridor 46 km; 910 m cable-stayed bridge; 1.32 km foot overbridge; travel time reduction from 60 to 20 min; design speed 80-100 kmph.
  • ›Target this Nodal Body: Ministry of Road Transport and Highways (for highways) and Ministry of Railways (for railway projects). Cabinet approval is by CCEA.
  • ›Target this Legal Point: Hybrid Annuity Mode (HAM) – a PPP model used in highway projects.

Mastered this topic? Test your knowledge with a full MCQ quiz.

Practice exam-style questions, track your score, and strengthen your recall.

Q1Static LinkageEasy

Which ministry is primarily responsible for implementing the elevated highway corridors approved by the Cabinet?

Q2Statement-basedHard

Consider the following statements regarding the projects approved by the Cabinet:

1. The Varuna river corridor is 43 km long and will be a 6/4-lane predominantly elevated corridor.

2. The Ganga river corridor includes a 1.32 km cable-stayed bridge.

3. The railway projects will increase freight traffic by 44 million tonnes per annum.

Which of the statements given above is/are correct?

Q3Data-centricEasy

What is the total cost of the projects approved by the Union Cabinet for the Varanasi elevated highway corridors?

Q4Application/ImpactMedium

What is the primary objective of the Ganga river elevated corridor project?

All 25 MCQs ▸
You finished this topic
Explore Related Topics
Related Current Affairs
Infrastructure Current Affairs

Cabinet Approves ₹8,970 Cr, 135.87 km NH-15 Guwahati-Tezpur Corridor with ELF for IAF

The Union Cabinet approved a 135.87 km, ₹8,970 crore Guwahati-Tezpur corridor on NH-15 in Assam, developed on BOT toll mode. It includes an emergency landing facility (ELF) for IAF, five bypasses, and connectivity to 8 PM Gati Shakti economic nodes. This project is a high-yield topic for Prelims data and Mains infrastructure/regional development.

Infrastructure Current Affairs

Cabinet Approves ₹13,041 Cr for Railway Multi-Tracking & NH-22 Highway to Decongest Howrah-Chennai Route

The Union Cabinet approved four railway multi-tracking projects and a four-lane highway project worth ₹13,041 crore to decongest the Howrah-Chennai high density route and improve connectivity in Bihar. These projects will add 410 km to the railway network and boost freight capacity by 76 MTPA, linking ports and industrial hubs.

Infrastructure Current Affairs

Bairabi-Sairang Railway Line Completes 1 Year: 15 Lakh Passengers, Rs 8,000 Cr Connectivity Boost in Mizoram

The Bairabi-Sairang railway line in Mizoram completed one year of operation, connecting the state capital Aizawl to the national rail network for the first time. With over 15 lakh passengers and 2,500 wagons of freight handled, the Rs 8,000 crore project has boosted tourism by 86% and opened new economic opportunities. This is a key example of infrastructure development in the Northeast, relevant for UPSC GS1 (geography & regional development) and GS3 (infrastructure & economy).

Infrastructure Current Affairs

Kerala Drops SilverLine; 873 km Railway Upgrade Underway for North-South Connectivity

Kerala has dropped the proposed SilverLine high-speed rail project. Instead, the state is focusing on a massive 873 km railway upgrade to improve north-south connectivity, with 267 km of projects already underway at a cost of ₹11,271 crore. This is a key infrastructure shift with implications for Kerala's development and the national rail network.

Infrastructure Current Affairs

₹3,198 Cr Railway Projects for Seemanchal Bihar: 764 Km New Lines, 11 Projects, Katihar Redevelopment

Indian Railways has planned 764 km of new line projects worth ₹3,198 Cr to boost connectivity in Bihar's Seemanchal region, linking it with West Bengal and North-Eastern states. The expansion includes 11 projects at various stages, and Katihar Junction (handling 172 passenger trains daily) has been identified for redevelopment under the Amrit Bharat Station Scheme.

Infrastructure Current Affairs

Rishikesh-Karnaprayag Rail Project: ₹37,000 Cr, 125 km, Set for December 2029 Completion

The Rishikesh-Karnaprayag rail project, costing ₹37,000 crore, is targeted for completion by December 2029. With 78% overall progress and 97% tunnel excavation done, it will improve connectivity to the Char Dham pilgrimage corridor, boost tourism, and strengthen border connectivity in Uttarakhand. This is a key infrastructure project for UPSC prelims (data points) and mains (infrastructure, regional development, border infrastructure).

Infrastructure Current Affairs

Second Saraighat Double-Decker Bridge: Construction Begins for 1.3 km Rail-Cum-Road Link Over Brahmaputra

Construction has begun on the Second Saraighat Bridge, a double-decker rail-cum-road bridge over the Brahmaputra in Assam, along with 7.2 km of railway track doubling. This project, under Northeast Frontier Railway (NFR) and executed by L&T, aims to boost multimodal connectivity in the Northeast. For exams, focus on the bridge's specifications: 1.3 km length, two rail lines, three-lane road, and the integration with NHAI road approaches.

Infrastructure Current Affairs

CCEA Approves 8 Railway Multi-Tracking Projects Worth ₹20,804 Cr Under PM Gati Shakti

CCEA approved eight railway multi-tracking projects costing ₹20,804 crore across nine states, adding 1,196 km to the Indian Railways network. The projects are planned under PM Gati Shakti National Master Plan and will generate additional freight capacity of 74 MTPA. For exams, remember the split: first five projects cover TN, AP, Karnataka and Telangana; the other three cover WB, Jharkhand, Odisha, MP and Chhattisgarh.