A stress-test analysis of India's long-term power plan suggests that replacing 87.2 GW of planned new coal capacity with massive renewable energy (RE) and storage build-out could save over ₹1.4 lakh crore annually. This is a critical debate for UPSC aspirants on India's energy security, cost structures, and the trade-offs between thermal and renewable power in achieving generation adequacy.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›Total Capacity Projection (2035-36): Over 1,100 GW
- ›Non-fossil Capacity Target: About 70%
- ›Target this Data: 1,100 GW total capacity & 70% non-fossil share projected for 2035-36 in NGAP.
- ›Target this Nodal Body: Central Electricity Authority (CEA) - the body that releases the National Generation Adequacy Plan (NGAP).
- ›Target this Constraint: The three system constraints for RE to replace coal: Storage continuity, Charging sufficiency, and Block-level deficits.
Mastered this topic? Test your knowledge with a full MCQ quiz.
Practice exam-style questions, track your score, and strengthen your recall.