India added over 45 GW of solar and wind in 2025 – matching the US – yet cheap power is stranded because the grid can't absorb it. Upgrading transmission and integrating storage can unlock 1,000 GW of clean energy without extra land, at ₹3.5/kWh. This is critical for India's 500 GW renewable target and climate goals.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›Renewable Capacity Added (2025): Over 45 GW (matching US)
- ›Levelised Cost of Firm Clean Power: ₹3.5 per kWh
- ›Target this Data: 45 GW (renewable capacity added in 2025), ₹3.5/kWh (cost of firm clean power), 1,000 GW (potential unlocked capacity).
- ›Target this Nodal Body: Ministry of New and Renewable Energy (MNRE) for renewable targets; Ministry of Power for grid infrastructure.
- ›Target this Concept: Transmission constraint as a barrier to renewable integration; Battery storage as enabler for firm power.
Mastered this topic? Test your knowledge with a full MCQ quiz.
Practice exam-style questions, track your score, and strengthen your recall.