InfrastructureEconomy
News 0 of 29

Cabinet Approves ₹7,145 Cr Kanpur-Kabrai Greenfield Highway Under PM GatiShakti

Target:UPSCMPSCSSC GATeachingPrelims HighMains MediumStatic GK Link
01 Jul 2026
~2 min
Source: Indian Express
Key Data:₹7,145 crore242 km58% travel time reduction3.5 hrs to 1.5 hrs80-100 kmph18,069 PCUs
Bodies:Union CabinetMinistry of Road Transport and HighwaysGovernment of Uttar Pradesh
Practice MCQs from today's news ▸
What This Article Covers

1.Union Cabinet approved a four-lane access-controlled greenfield highway from Kanpur to Kabrai (Uttar Pradesh) at a cost of ₹7,145 crore.

2.The 242-km project, part of the Kanpur-Bhopal economic corridor, will reduce travel time from 3.5 hours to 1.5 hours (58% reduction).

3.Aligned with PM GatiShakti, the highway will improve connectivity to 16 economic nodes, 9 social nodes, and 10 logistics nodes, generating ~1.2 crore person-days of employment.

The Big Picture
Prelims · HighMains · Medium

The Union Cabinet has approved a ₹7,145 crore, 242-km four-lane greenfield highway from Kanpur to Kabrai (UP), slashing travel time by 58% to 1.5 hours. This project under the Kanpur-Bhopal Economic Corridor, aligned with PM GatiShakti, connects UP's industrial hubs with MP's mineral-rich regions, boosting logistics and regional development.

Exam Lens

Quick Exam Facts From News

Project Cost₹7,145 crore
Length242 km
Travel Time Reduction3.5 hrs to 1.5 hrs (58%)
Speed Range80-100 kmph
Employment Generated~1.2 crore person-days (direct + indirect)
Projected AADT by FY 202818,069 PCUs

1-Minute Revision

  • ›Project Cost: ₹7,145 crore
  • ›Length: 242 km
  • ›Target this Data: ₹7,145 crore cost, 242 km length, 58% travel time reduction (3.5 to 1.5 hrs).
  • ›Target this Nodal Body: Union Cabinet / Ministry of Road Transport and Highways (MoRTH).
  • ›Target this Scheme/Initiative: PM GatiShakti National Master Plan / Kanpur-Bhopal Economic Corridor.

Mastered this topic? Test your knowledge with a full MCQ quiz.

Practice exam-style questions, track your score, and strengthen your recall.

Q1Static LinkageEasy

Which ministry is primarily responsible for the implementation of the greenfield highway project mentioned in the news?

Q2Statement-basedHard

Consider the following statements regarding the Kanpur-Kabrai greenfield highway:

1. The highway is part of the Kanpur-Bhopal economic corridor.

2. It will connect the Bundelkhand Expressway with the Kanpur Ring Road.

3. The project is aligned with the PM GatiShakti National Master Plan but does not include any railway station connectivity.

Which of the statements given above is/are correct?

Q3Data-centricMedium

What is the total cost approved by the Union Cabinet for the Kanpur-Kabrai greenfield highway project?

Q4Application/ImpactMedium

What is the primary objective of the Kanpur-Kabrai greenfield highway project?

All 15 MCQs ▸
You finished this topic
Explore Related Topics
Related Current Affairs
Infrastructure Current Affairs

Cabinet Approves ₹8,970 Cr, 135.87 km NH-15 Guwahati-Tezpur Corridor with ELF for IAF

The Union Cabinet approved a 135.87 km, ₹8,970 crore Guwahati-Tezpur corridor on NH-15 in Assam, developed on BOT toll mode. It includes an emergency landing facility (ELF) for IAF, five bypasses, and connectivity to 8 PM Gati Shakti economic nodes. This project is a high-yield topic for Prelims data and Mains infrastructure/regional development.

Infrastructure Current Affairs

Cabinet Approves ₹13,041 Cr for Railway Multi-Tracking & NH-22 Highway to Decongest Howrah-Chennai Route

The Union Cabinet approved four railway multi-tracking projects and a four-lane highway project worth ₹13,041 crore to decongest the Howrah-Chennai high density route and improve connectivity in Bihar. These projects will add 410 km to the railway network and boost freight capacity by 76 MTPA, linking ports and industrial hubs.

Infrastructure Current Affairs

CCEA Approves 8 Railway Multi-Tracking Projects Worth ₹20,804 Cr Under PM Gati Shakti

CCEA approved eight railway multi-tracking projects costing ₹20,804 crore across nine states, adding 1,196 km to the Indian Railways network. The projects are planned under PM Gati Shakti National Master Plan and will generate additional freight capacity of 74 MTPA. For exams, remember the split: first five projects cover TN, AP, Karnataka and Telangana; the other three cover WB, Jharkhand, Odisha, MP and Chhattisgarh.

Infrastructure Current Affairs

Alluri Sitarama Raju International Airport: ₹5,640 Cr Greenfield Airport Dedicated in Andhra Pradesh

PM Modi inaugurated the Alluri Sitarama Raju International Airport at Bhogapuram, Andhra Pradesh — the state's first greenfield airport built at ₹5,640 crore under PPP. This event marks a major push for regional aviation, with the airport designed to handle 6 million passengers annually, and signals the government's focus on connecting smaller cities through expanded airport infrastructure (74 airports in 2014 → 166 now).

Infrastructure Current Affairs

₹9,450 Cr Railway Multitracking Approved Under PM Gati Shakti for 4 States

The Cabinet Committee on Economic Affairs has approved four railway multitracking projects across eight districts in West Bengal, Odisha, Tamil Nadu and Andhra Pradesh at a total cost of ₹9,450 crore. Expected to be completed by 2030-31, these projects will add about 410 km of track capacity, boost freight movement by 76 million tonnes per annum, and improve connectivity to key tourist destinations under the PM Gati Shakti National Master Plan.

Economy Current Affairs

FASTag Full Implementation to Save ₹25,000 Cr/yr; Barrier-Free Toll Booths Target March 2027

India's highway toll system is undergoing a digital transformation. Full FASTag implementation will save the government ₹25,000 crore annually, and all toll booths will become barrier-free by March 2027 — cutting operational costs and fuel wastage. This is a major efficiency reform with direct exam relevance for infrastructure, digital payments, and fiscal savings.

Infrastructure Current Affairs

WDFC Fully Operational: 2,843 km DFC Network Transforms India’s Logistics Under PM GatiShakti

The Western Dedicated Freight Corridor (WDFC) is now fully operational, completing India’s 2,843-km freight backbone. Combined with the Eastern DFC, this structural transformation is expected to slash logistics costs, boost manufacturing, and integrate ports under the PM GatiShakti and Sagarmala frameworks. For UPSC/SSC aspirants, this is a critical Mains topic linking infrastructure, economy, and planning.

Infrastructure Current Affairs

NHAI Issues New Guidelines for High-Speed Corridors: Lane Norms, Barrier-less Tolling, and Vision 2047 Target

NHAI has issued comprehensive guidelines for the design and construction of high-speed corridors (expressways), including lane norms based on traffic volume (PCU), access control, signage, barrier-less tolling, and boundary walls. This move aims to standardize DPR preparation and aligns with India's Vision 2047 target of 50,000 km of high-speed corridors by 2036-37. Students must note the PCU thresholds, signage distances, and the RCC boundary wall height for prelims.