The Western Dedicated Freight Corridor (WDFC) is now fully operational, completing India’s 2,843-km freight backbone. Combined with the Eastern DFC, this structural transformation is expected to slash logistics costs, boost manufacturing, and integrate ports under the PM GatiShakti and Sagarmala frameworks. For UPSC/SSC aspirants, this is a critical Mains topic linking infrastructure, economy, and planning.
Exam Lens
Quick Exam Facts From News
1-Minute Revision
- ›Total DFC Length: 2,843 km
- ›WDFC Length: 1,506 km (Dadri to JNPT)
- ›Target this Data: WDFC length = 1,506 km, EDFC = 1,337 km; total DFC network = 2,843 km
- ›Target this Data: Average DFC trains per day = 443 (Aug 2026); logistics cost = 7.97% of GDP
- ›Target this Nodal Body: Ministry of Railways (for DFCs); DPIIT (for PM GatiShakti)
- ›Target this Scheme: PM GatiShakti National Master Plan (2021)
Mastered this topic? Test your knowledge with a full MCQ quiz.
Practice exam-style questions, track your score, and strengthen your recall.