EconomyInfrastructure
News 0 of 33

₹28,840 Cr Revamped UDAN Scheme Approved; VGF of ₹10,043 Cr for 10 Years, Funding Shift from Levy to Exchequer

Target:UPSC GS-IIIMPSCSSC GATeachingPrelims HighMains MediumStatic GK Link
25 Mar 2026
~2 min
Source: The Hindu
Key Data:₹28,840 crore₹10,043 crore VGF100 airports200 helipads₹3,661 crore for helipads₹12,159 crore for airport redevelopment
Practice MCQs from today's news ▸
What This Article Covers

1.Cabinet approves revamped UDAN scheme with total outlay of ₹28,840 crore, a nearly six-fold increase over the earlier allocation.

2.Funding model shifts from Regional Connectivity Scheme (RCS) levy on non-UDAN passengers to direct government subsidy, with ₹10,043 crore allocated for Viability Gap Funding (VGF) over 10 years.

3.Strategic focus on airport redevelopment, Operations & Maintenance (O&M) support, and last-mile connectivity through helipads in difficult terrains.

The Big Picture
Prelims · HighMains · Medium

The Union Cabinet has approved a major expansion of the UDAN (Ude Desh ka Aam Naagrik) regional connectivity scheme with a six-fold budget increase to ₹28,840 crore. The key reform shifts the subsidy funding model from a passenger levy to direct government expenditure, aiming to enhance viability and expand airport and helipad infrastructure nationwide.

Exam Lens

Quick Exam Facts From News

Total Outlay₹28,840 crore
Viability Gap Funding (VGF)₹10,043 crore (10 years)
Airports to be Redeveloped100 airports
Helipads Proposed200 helipads

1-Minute Revision

  • ›Total Outlay: ₹28,840 crore
  • ›Viability Gap Funding (VGF): ₹10,043 crore (10 years)
  • ›Target this Data: Total outlay of ₹28,840 crore and VGF of ₹10,043 crore over 10 years.
  • ›Target this Nodal Body: Ministry of Civil Aviation (responsible for UDAN scheme).
  • ›Target this Policy Shift: Funding model change from RCS levy to direct government subsidy.

Mastered this topic? Test your knowledge with a full MCQ quiz.

Practice exam-style questions, track your score, and strengthen your recall.

Q1Static LinkageEasy

Which ministry is primarily responsible for the implementation of the UDAN (Regional Connectivity Scheme)?

Q2Statement-basedHard

Consider the following statements regarding the revamped UDAN scheme:

1. The total outlay for the revamped scheme is ₹28,840 crore, which is a nearly six-fold increase over the earlier allocation.

2. The subsidy to airlines will now be funded through a levy on passengers flying on non-UDAN routes, as per the earlier model.

3. The scheme proposes to develop 200 helipads with an estimated total investment of ₹3,661 crore.

Which of the statements given above is/are correct?

Q3Data-centricMedium

What is the allocated amount for Viability Gap Funding (VGF) to support regional routes under the revamped UDAN scheme, as per the news?

Q4Application/ImpactMedium

What is the primary objective of shifting the airline subsidy burden to the government exchequer in the revamped UDAN scheme?

All 25 MCQs ▸
You finished this topic
Explore Related Topics
Related Current Affairs
Economy Current Affairs

Centre Invokes Section 11 Emergency, Directs 112 Captive Coal Plants to Max Capacity from Oct 1

Amid an unusual September power demand surge (peak 269 GW), the government invoked Section 11 of the Electricity Act to mandate 112 captive coal plants (≥50 MW) to run at full capacity from Oct 1 to Dec 31. This emergency move aims to maximize electricity availability and is exam-relevant for its legal provision, institutional mechanism (CEA), and energy security context.

Infrastructure Current Affairs

₹9,450 Cr Railway Multitracking Approved Under PM Gati Shakti for 4 States

The Cabinet Committee on Economic Affairs has approved four railway multitracking projects across eight districts in West Bengal, Odisha, Tamil Nadu and Andhra Pradesh at a total cost of ₹9,450 crore. Expected to be completed by 2030-31, these projects will add about 410 km of track capacity, boost freight movement by 76 million tonnes per annum, and improve connectivity to key tourist destinations under the PM Gati Shakti National Master Plan.

Economy Current Affairs

FASTag Full Implementation to Save ₹25,000 Cr/yr; Barrier-Free Toll Booths Target March 2027

India's highway toll system is undergoing a digital transformation. Full FASTag implementation will save the government ₹25,000 crore annually, and all toll booths will become barrier-free by March 2027 — cutting operational costs and fuel wastage. This is a major efficiency reform with direct exam relevance for infrastructure, digital payments, and fiscal savings.

Economy Current Affairs

Viksit Bharat: States, Finance Ministry Discuss Agricultural Exports, Energy Transition, Private Investment

Union Finance Ministry held a first-of-its-kind conference with state finance ministers on 'Financing India's Journey towards Viksit Bharat'. Key discussions included boosting agricultural exports, addressing logistical gaps, energy transition challenges, and the need for private sector investment. The conference highlighted examples like Meghalaya flowers vs Vietnam and sesame seed value addition, emphasizing India's untapped export potential.

Economy Current Affairs

GeM Completes 10 Years: ₹20 Lakh Crore GMV, 1.37 Lakh Buyers, 25 Lakh Sellers

The Government e Marketplace (GeM) has completed 10 years as a transformative digital platform for public procurement, achieving a cumulative Gross Merchandise Value of ~₹20 lakh crore. A recent IIT Delhi study (Jul-Aug 2026) found it generated ₹86,571.69 crore in monetised benefits over the last three financial years, making it a critical engine for Viksit Bharat 2047 and Ease of Doing Business.

Economy Current Affairs

Rs 12.22 Lakh Crore Capex Target for 2026-27: Can Public Investment Crowd In Private Capex?

India's capex strategy is a key driver of growth, with effective capital expenditure reaching Rs 17.15 lakh crore for 2026-27. The article examines whether public investment can crowd in private investment, the need for quality over quantity, and the next frontiers like digital infrastructure, AI, and semiconductors.

Environment Current Affairs

India's Data Centre Boom: $200B Investment, 6.5 GW Capacity by 2030 Strains Power & Water

India's data centre capacity is set to quadruple to 6.5 GW by 2030, driving $200 billion investment. However, this boom is colliding with climate reality: soaring electricity demand (57 TWh), water consumption (358 billion litres annually), and heat generation. The governance gap, with no enforceable standards, risks socializing costs to consumers and worsening water/energy stress.

Infrastructure Current Affairs

WDFC Fully Operational: 2,843 km DFC Network Transforms India’s Logistics Under PM GatiShakti

The Western Dedicated Freight Corridor (WDFC) is now fully operational, completing India’s 2,843-km freight backbone. Combined with the Eastern DFC, this structural transformation is expected to slash logistics costs, boost manufacturing, and integrate ports under the PM GatiShakti and Sagarmala frameworks. For UPSC/SSC aspirants, this is a critical Mains topic linking infrastructure, economy, and planning.