EnergyInfrastructure
News 0 of 24

Grid India Proposes Repurposing 1.8 GW Underutilised Thermal Plants as Synchronous Condensers

Target:UPSCMPSCTeachingPrelims HighMains High
23 Jun 2026
~2 min
Source: Indian Express
Key Data:1.8 GW9 thermal unitsJune 2024 grid eventSpain/Portugal disturbance April 2025
Bodies:Grid IndiaPower SecretaryNorthern Regional Power Committee
Practice MCQs from today's news ▸
What This Article Covers

1.Grid India proposes converting 9 underutilized thermal units (total 1.8 GW) into synchronous condensers to enhance grid reliability.

2.Eight coal/lignite units and one gas unit across Rajasthan, Gujarat, Maharashtra, Karnataka, Tamil Nadu are shortlisted.

3.Repurposing aims to retain essential reliability services (inertia, reactive power) near renewable energy hubs and weak grid areas.

The Big Picture
Prelims · HighMains · High

Grid India identifies 9 underutilized thermal units (1.8 GW) in 5 states for conversion into synchronous condensers to provide grid stability (inertia, reactive power) amid rising renewable energy penetration. The move follows grid disturbances in India (June 2024) and Europe (April 2025), highlighting the need for voltage and frequency support.

Exam Lens

Quick Exam Facts From News

Shortlisted units9 thermal units (8 coal/lignite, 1 gas)
Total capacityAbout 1.8 GW
States involvedRajasthan, Gujarat, Maharashtra, Karnataka, Tamil Nadu
Nodal agencyGrid Controller of India (Grid India)
Referenced grid eventJune 2024 Champa-Kurukshetra HVDC trip (16.5 GW load reduction in Northern Region)
International referenceSpain/Portugal disturbance on 28 April 2025

1-Minute Revision

  • ›Shortlisted units: 9 thermal units (8 coal/lignite, 1 gas)
  • ›Total capacity: About 1.8 GW
  • ›Target this Data: 9 thermal units, total capacity ~1.8 GW, 8 coal/lignite + 1 gas-based.
  • ›Target this Nodal Body: Grid Controller of India (Grid India) – under Ministry of Power.
  • ›Target this Legal Point: Proposal follows April review meeting chaired by Union Power Secretary Pankaj Agarwal; references Northern Regional Power Committee recommendations.

Mastered this topic? Test your knowledge with a full MCQ quiz.

Practice exam-style questions, track your score, and strengthen your recall.

Q1Static LinkageEasy

Which organisation is responsible for coordinating and monitoring the national power grid in India and proposed the repurposing of thermal units into synchronous condensers?

Q2Statement-basedHard

Consider the following statements:

1. Synchronous condensers generate active electricity to support the grid during fluctuations.

2. The proposed repurposing includes both coal- and gas-based thermal units.

3. The Champa-Kurukshetra HVDC link tripping in June 2024 caused a load reduction of about 16.5 GW in the Northern Region.

Which of the statements given above is/are correct?

Q3Data-centricMedium

How many thermal power units were identified by Grid India for possible conversion into synchronous condensers, and what is their combined capacity?

Q4Application/ImpactMedium

What is the primary benefit of converting underutilised thermal plants into synchronous condensers, as highlighted in the news?

All 25 MCQs ▸
You finished this topic
Explore Related Topics
Related Current Affairs
Environment Current Affairs

India Crosses 300 GW Non-Fossil Capacity, Targets 500 GW by 2030; Solar Leads at 164.59 GW

India has crossed 300 GW non-fossil fuel capacity (300.50 GW as of July 31, 2026), accounting for over 54% of total installed capacity. Solar power leads at 164.59 GW. The country is on track for 500 GW by 2030. Key schemes like PM Surya Ghar have benefited 19 lakh households with zero electricity bills. This milestone is crucial for exams on energy transition, climate policy, and government schemes.

Environment Current Affairs

131 GW Canal-Top Solar Potential: MNRE Pilot Scheme, PM Surya Sarovar Yojana Boost Land-Free Renewable Energy

India's vast canal network offers a land-free path to solar power via Canal-Top Photovoltaics (CTPV). With land acquisition for solar projects becoming expensive, CTPV saves land, reduces water evaporation, and improves panel efficiency. A 2024 assessment estimates 131 GW potential, but high costs and structural challenges limit deployment. The PM Surya Sarovar Yojana (floating solar) signals growing policy interest in land-neutral solar.

Science & Tech Current Affairs

Subsea Cables Carry 99% Internet Traffic: Vulnerabilities, Ownership Concentration & India's Resilience Plan

Subsea cables carry over 99% of global internet traffic, yet their supply chain is concentrated among a few private players and hyperscalers, making them vulnerable to sabotage, cyberattacks, and economic disruption. Recent NATO, Finland, and China incidents highlight intensifying threats, while India is building repair capacity via a DoT single-window clearance portal. This is a high-yield topic for GS3 infrastructure, science-tech, and security questions.

Science & Tech Current Affairs

National Green Hydrogen Mission: 400-500 Buses/Trucks by 2030, Trials on 20 Highways

India's National Green Hydrogen Mission targets 400-500 hydrogen-fuelled heavy-duty buses and trucks by 2030. To achieve this, 70 vehicles have been sanctioned for trials across 20 highways, with the goal of achieving operating cost parity with diesel in 2-3 years.

Infrastructure Current Affairs

KAVACH Version 4.0 Commissioned on SCR: India’s Indigenous Automatic Train Protection System Explained

KAVACH, India's indigenous Automatic Train Protection (ATP) system, has been upgraded to Version 4.0 and commissioned on the South Central Railway's Malkajgiri–Kamareddi section over 108 route km. This is crucial for UPSC as it touches infrastructure, safety technology, and comparisons with global systems like ETCS, ATC, and PTC. The article also links to Sam Pitroda committee recommendations on railway modernisation.

Environment Current Affairs

EAC Recommends Green Nod for 1,605 MW Subansiri Upper Project; 1.35 Lakh Trees at Risk

The EAC's recommendation for environmental clearance to the 1,605 MW Subansiri Upper Hydro Project highlights the tension between hydropower development and forest conservation. Key issues include diversion of 2,733 hectares of forest land, felling of 1.35 lakh trees, and compensatory afforestation in MP. This is crucial for UPSC Mains GS3 (Environment, Infrastructure) and Prelims (Forest Conservation Act, EAC).

Economy Current Affairs

Kudankulam Nuclear Reactor Costs Surge 55%: Impact on India's Nuclear Expansion Plans

Cost of four under-construction nuclear reactors at Kudankulam has risen by 55% to ₹1,38,330 crore, driven by Russia-Ukraine war. This poses a challenge to India's ambitious nuclear expansion plans and could increase electricity tariffs, especially as the government opens the sector to private participation.

Infrastructure Current Affairs

Amit Shah Flags Off India's First LNG-Powered Train: Dual-Fuel Tech to Cut Diesel Use by 40%

India's first LNG-powered train, flagged off by Amit Shah from Sabarmati, marks a major shift towards cleaner fuel in railways. The dual-fuel system can replace up to 40% of diesel, cutting emissions and saving Rs 23.9 lakh per year per rake. This is a key initiative for sustainable transportation and energy efficiency.